BIOS - Bioenergy
  YOUR PARTNER FOR ENERGY FROM BIOMASS AND ENERGY EFFICIENCY  
 

Biomass CHP plant based on an ORC cycle / Theurl sawmill (Tyrol, Austria)

Relevant technical data:

  • Nominal thermal capacity: 6.5 MW biomass thermal oil boiler + 500 kW warm water economiser
  • Nominal electric capacity: 1.0 MW ORC process
  • Start of operation: 2004

Images

Fig. 1
Fig. 6
Fig. 2
Fig. 7
Fig. 3
Fig. 8
Fig. 4
Fig. 9
Fig. 5
Fig. 10