BIOS - Bioenergy
  YOUR PARTNER FOR ENERGY FROM BIOMASS AND ENERGY EFFICIENCY  
 

CFD simulation and support of biomass furnace and boiler design for the CHP plant Grossaitingen (Bavaria, Germany) / Josef Bertsch Gesellschaft m.b.H. & Co (Bludenz, Austria)

Relevant technical data:

  • Nominal thermal capacity: 16.5 MW biomass steam boiler
  • Nominal electric capacity: 5.0 MW steam turbine
  • Fuel: waste wood
  • Project period: 2001-2003

Images

Fig. 1
Fig. 2
Fig. 3