Biomass CHP plant based on an ORC cycle / TILLY Holzindustrie Ges.m.b.H. (Carinthia, Austria)
Relevant technical data:
- Nominal thermal capacity: 10 MW biomass thermal oil boiler + 1.5 MW warm water economiser
- Nominal electric capacity: 1.5 MW ORC process
- Start of operation: 2005/2006
Technological innovations:
- First ORC – process for water outlet temperatures up to 120 °C. (Specially optimised for high process heat temperatures in wood processing plants)
- Development and Optimisation of a multifuel biomass combustion plant.
Link:
The ORC process








