Biomass CHP plant based on an ORC cycle / Theurl sawmill (Tyrol, Austria)
Relevant technical data:
- Nominal thermal capacity: 6.5 MW biomass thermal oil boiler + 500 kW warm water economiser
- Nominal electric capacity: 1.0 MW ORC process
- Start of operation: 2004
Link:
The ORC process









