BIOS - Bioenergy
  YOUR PARTNER FOR ENERGY FROM BIOMASS AND ENERGY EFFICIENCY  
 

Extension of the existing biomass district heating plant in Tamsweg with a biomass CHP plant based on an ORC cycle / Tamsweg (Salzburg, Austria)

Relevant technical data:

  • Total nominal thermal capacities: 3.2 MW biomass thermal oil boiler + 0.5 MW pressurised hot water economiser    
  • Already existing plants: 5.0 MW biomass pressurised hot water boiler; 2.5 MW flue gas condensation unit; 9.0 MW oil boiler (peak load coverage and stand-by unit);
  • Nominal electric capacity: 0.5 MW ORC process
  • Start of operation: 2006

Images

Click to zoom
Fig. 2
Fig. 3
Fig. 4
Fig. 5