BIOS - Bioenergy
  YOUR PARTNER FOR ENERGY FROM BIOMASS AND ENERGY EFFICIENCY  
 

Biomass District Heating Plant Sulzberg (Vorarlberg, Austria)

Relevant technical data

  • Nominal thermal capacity:
    0.6 MW biomass pressurised hot water boiler 1
    0.06 MW hot water economiser 1
    0.45 MW biomass pressurised hot water boiler 2
    0.04 MW hot water economiser 2
    1.25 MW oil-fired peak load boiler
  • District heating system:
    Length of network of pipes: 4.8 km
    Extension of district heating system 2007/2008 with twin-pipes (1.8 km)
  • Start of operation: 2002, extension of plant 2007

Images

Click to zoom
Fig. 5
Fig. 2
Fig. 6
Fig. 3
Fig. 7
Fig. 4
Fig. 8
Fig. 9
Fig. 10
Fig. 11