Biomass District Heating Plant St. Walburg in the Ulten Valley (South Tyrol, Italy)

Relevant technical data

  • Nominal thermal capacity: 1.4 MW biomass pressurised hot water boiler + 120 kW pressurised hot water economiser
  • Length of the network of pipes: approximately 5,200 m
  • Start of operation: 2000
  • Extension of district heating system 2006-2008:
    total length of the network of pipes 10,300 m
    5,100 m with twin-pipes
    decentralised hot water buffer storage tanks

Biomass CHP plant based on an ORC cycle - St.Walburg in the Ulten Valley (South Tyrol, Italy)

Relevant technical data of the biomass CHP plant:

  • Nominal thermal capacity: 1.2 MW biomass thermal oil boiler + 0.13 MW pressurised hot water economiser
  • Nominal electric capacity: 0.2 MW ORC unit
  • Start of operation: 2007

The ORC Process