BIOS - Bioenergy
  YOUR PARTNER FOR ENERGY FROM BIOMASS AND ENERGY EFFICIENCY  
 

Biomass CHP plant based on an ORC cycle and a newly developed fuzzy logic control system / Stadtwärme Lienz - EU-THERMIE demonstration project (Tyrol, Austria)

Relevant technical data

  • Nominal electric capacity: 1.00 MW
  • Nominal thermal capacities: 6.0 MW (thermal oil boiler) + 7.0 MW (pressurised hot water boiler) + 1.5 MW (heat recuperation in economiser)
  • Start of operation: October 2001

Link: The ORC process

Biomass CHP Plant Lienz

Fig. 1 – Click to zoom

Biomass CHP Plant Lienz - acts & facts

Roofed storage capacity 5,000 m2
Open storage capacity 10,000 m2
Solar thermal collector 630 m2
Nominal power thermal oil boiler 6,000 kW
Nominal power thermal oil ECO 500 kW
Nominal power pressurised hot water boiler 7,000 kW
Nominal power hot water ECO 1,500 kW
Nominal power oil boiler (peak load coverage) 11,000 kW
Maximum thermal power solar thermal collector 350 kW
Net electric power ORC 1,000 kW
Production of heat from biomass 60,000 MWh/a
Production of heat from solar energy 250 MWh/a
Production of electricity from biomass 7,200 MWh/a

Biomass CHP Plant Lienz - acts & facts II

Primary Energy    
Bark, saw dust, wood chips from local saw mills 90,000 m2/a
Rural wood chips 10,000 m2/a
Investment costs    
CHP plant 7.7 Mio €
District heating grid 15.4 Mio €

Technological innovations

  • First 1,000 kWel biomass combined heat and power plant based on the ORC-process worldwide
  • First use of a specially developed heat recuperation system for thermal oil boilers to increase the electric efficiency
  • Use of a Fuzzy Logic control for process optimisation
  • Efficient, multi-stage flu gas cleaning system consisting of multi-cyclone, economiser and wet electrostatic precipitator combined with a flue gas condensation unit

Graphics

Fig. 2
Fig. 5
Fig. 3
Fig. 6
Fig. 4

Images

Fig. 7
Fig. 11
Fig. 15
Fig. 8
Fig. 12
Fig. 16
Fig. 9
Fig. 13
Fig. 10
Fig. 14

Biomass CHP plant based on an ORC process - realised EU-demonstration project in Admont/Austria – PDF#0070

FUZZY LOGIC CONTROLLED CHP PLANT FOR BIOMASS FUELS BASED ON A HIGHLY EFFICIENT ORC PROCESS - EU DEMONSTRATION PROJECT LIENZ – PDF#0001

Heinz Reisinger*, Gerold Pointner*, Ingwald Obernberger**, Peter Thonhofer**, Erwin Reisenhofer**

*STADTWAERME LIENZ, Schulgasse 1, A-9900 Lienz, Österreich
**BIOS BIOENERGIESYSTEME GmbH, Inffeldgasse 21b, A-8010 Graz, Österreich

Biomasse-KWK auf Basis des ORC-Prozesses - Vorstellung der EU-Demonstrationsprojekte Holzindustrie STIA/Admont und Fernheizwerk Lienz (Österreich) – PDF#0004

Ingwald Obernberger*

*BIOS BIOENERGIESYSTEME GmbH, Inffeldgasse 21b, A-8010 Graz, Austria

STATE-OF-THE-ART AND FUTURE DEVELOPMENTS REGARDING SMALL-SCALE BIOMASS CHP SYSTEMS WITH A SPECIAL FOCUS ON ORC AND STIRLING ENGINE TECHNOLOGIES – PDF#0005

Ingwald Obernberger*, Henrik Carlsen**, Friedrich Biedermann*

*BIOS BIOENERGIESYSTEME GmbH, Inffeldgasse 21b, A-8010 Graz, Austria
**Technical University of Denmark, Section Energy Engineering, Dept. of Mechanical Engineering, Denmark