Biomass CHP plant based on an ORC cycle – extension Stadtwärme Lienz (Tyrol, Austria)

Relevant technical data of the first plant:

  • Nominal electric capacity: 1.00 MW
  • Nominal thermal capacities: 6.0 MW (thermal oil boiler) + 7.0 MW (pressurised hot water boiler) + 1.5 MW (heat recuperation in economiser)
  • Start of operation: October 2001

Link: First plant Stadtwärme Lienz

Relevant technical data of the extension plant:

  • Nominal electric capacity: 1.5 MW ORC process
  • Nominal thermal capacity: 8.7 MW biomass thermal oil boiler + 1.3 MW pressurised hot water economisers
  • Buffer store: 400,000 l
  • Start of operation: 2005

Link: The ORC process