Biomass CHP plant based on an ORC cycle at Kuressaare Soojus (Kuressaare, Estonia)
Relevant technical data of the ORC process:
- Nominal electric capacity: 2.20 MW
- Nominal thermal capacities: 12 MW (thermal oil boiler and thermal oil economisers)
- Projected start of operation: 2012


