BIOS - Bioenergy
  YOUR PARTNER FOR ENERGY FROM BIOMASS AND ENERGY EFFICIENCY  
 

Biomass CHP plant based on an ORC cycle – Dobbiaco (Dobbiaco, South Tyrol)

Planning performed in cooperation with SEEGEN/Salzburg.

Relevant technical data:

  • Nominal thermal capacity: 8.7 MW biomass thermal oil boiler + 500 kW pressurised hot water economiser + 2.4 MW flue gas condensation unit
  • Nominal electric capacity: 1.5 MW ORC process
  • Start of operation: autumn 2003

Images

Fig. 1 – Click to zoom
Fig. 2
Fig. 3
Fig. 4